Dan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud of
Talking Connect the Logs - Olylog, Lagbolt, Cable systems, Springs

I am familiar with Lagbolts and Olylogs, and I've head of the spring loaded method.

Tim, can you shed some light on the cable system you use?

We used Lagbolts on our home. We were told by a few people that lagbolts would be better than OlyLogs. Personally I looked at the Olylogs and they look like glorified drywall screws.

I know that lagbolts are more labor intensive, but sometimes you have to place cost over convenience.

I've head of the spring loaded connectors, but I'm not 100% on how they work.

Share the knowledge!

Dan
Reply With Quote


  #2  
Old 03-24-2003, 06:55 PM
Tim Bullock's Avatar
Tim Bullock Tim Bullock is offline
Postus Mostus
 
Join Date: Feb 2003
Posts: 1,232
Tim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud of
Dan, Lag Bolts would hold a lot better than Olylog simply because the thread cross section is larger. We make up our own cables with 3/16" S/S Cable, 3/8" threaded rod with an "eye" and splice the cable through the eye. The rod is longer at the bottom (under the subfloor) which allows for a 700 lb spring to fit over the eye and attached with a washer and a nut. As the building is reassembled we thread the cable through the predrilled holes all the way to the top and secure it at the top with another nut and washer. Simply tighten the cable at the bottom to put pressure on the logs and adjust as shrinkage occurs. We precut/splice the cable as we drill prior to taking apart the building....all pretty simple.
Reply With Quote
  #3  
Old 03-25-2003, 04:15 AM
Dan Bodenstein's Avatar
Dan Bodenstein Dan Bodenstein is offline
Are we there yet?
 
Join Date: Feb 2003
Location: West Palm Beach, Florida
Posts: 144
Dan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud of
Post Cable and Spring

Tim,

You're right it sounds simple. So simple it doesn't make sense why others would not use it. Although, does it cause a problem while stacking the logs. In other words, it sounds like the logs are just sitting on top of each other while being stacked... no support until the last log is placed.

I'd love to see a drawing of this system. Do you have one you can post.

I am glad that I am not insane on the OlyLog issue.

Thanks for clearing that up!
Dan
Reply With Quote
  #4  
Old 03-25-2003, 01:25 PM
Tim Bullock's Avatar
Tim Bullock Tim Bullock is offline
Postus Mostus
 
Join Date: Feb 2003
Posts: 1,232
Tim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud of
Dan........It is simple actually.......If there was a tendency for the logs to roll in/out...temporary bracing could be used. Further, unlike thubolts, it is not necessary to be 100% accurate with the hole drilling. You can see through bolt blow-outs on Handcrafted Log Homes all of the time.........pretty hard to drill a 10' long hole.
No drawing program here at home........but it is really as simple as it sounds.........LOL.
Reply With Quote
  #5  
Old 03-26-2003, 03:02 AM
Kyle - Utah's Avatar
Kyle - Utah Kyle - Utah is offline
Registered User
 
Join Date: Mar 2003
Location: Utah (MCDBA, MCSE, MCSD, CCNP, CCIE, Electrical Engineering BS, Cultural Anthropology MA, Business Economics MA, Finance phD)
Posts: 139
Kyle - Utah is on a distinguished road
Spring & Cable, Pros and Cons...

Hello Dan,

I noticed that you took an interest in the spring and cable method of securing logs. It is quick. It is easy, but is it the right thing to do? You need to ask yourself whether the purpose for doing this is to create a self-adjusting compression fit that adds safety and stability to your home or if the purpose is to just squeak by with the bare minimum that your local building codes require.

How about a couple of examples?

Take ten pencils and drill holes through them about an inch from each end. Then cut a couple of rubber bands and thread them through the holes. Tie big knots at the top and bottom so that they look like they are stacked logs. They hold together nicely and keep pressure near the areas where they are threaded through. The finished product creates a flimsy 'board' that acts like a slice of cheese unless the rubber bands are pulled very tightly.

Now take another ten pencils and pre-drill holes so that you can connect them together in stacks of three with small brads. Stagger the holes so that the third pencil in each group is included in the next group. This just gets confusing so assume that the 'n's in the following example are the nails and it should make a bit more sense:


.=====n==========n==========n======
.=====n====n=====n====n=====n======
.==========n==========n============
.=====n====n=====n====n=====n======
.=====n==========n==========n======
.=====n====n=====n====n=====n======
.==========n==========n============
.=====n====n=====n====n=====n======
.=====n==========n==========n======
.=====n==========n==========n======

If you pick this puppy up you have what amounts to a board.

In the first example you have a finished product that would appear to be more seismically sound. The only problem is that if you pull hard on any of the pencils the rubber band either snaps or pulls through the entire assembly. This leaves you with pencils flying everywhere.

In the second example you must imagine that the holes are actually larger in diameter than the rods that pass through them. This allows them to slip and move in the event of an earthquake. They still exert downward pressure to keep the logs snugly joined, but they are 'fluid' in the case of settling or in an earthquake.

You can have the best of both worlds here. It involves a product called "All-Thread." This is the stuff that looks like a threaded bolt without the hex top. It's just threaded rod. The beauty of this stuff is that it comes in lengths of up to 24'. This permits you to custom cut every 'bolt' so that it fits exactly. You use this stuff just like the example using the n's above, but with a slight twist. The bottom of the 'bolt' receives a nut and a washer as you might expect. The top gets a washer, a spring, another washer, and finally a nut. The nuts are secured using a product called LockTite, or better yet, tack-welded and using LockTite. (Tool discount centers usually sell small 110V 100Amp welders for under $75.) This prevents them from moving over time.

What you get looks something ike this:

#
----
@
@
----
==========

Log Here

==========

Log Here

==========

Log Here

==========
----
#

And now for the bad news. Doing things this way means that you will also need to back-drill the log that is going to sit on top of this assembly. This allows the spring and nut on top a place to live. Be sure to use a torque wrench when tightening the top nut so that each 'bolt' applies even pressure to your logs. The number of foot-pounds of pressure to apply will depend on the type of wood that you are building with. Amazingly enough, this pressure rating will likely be found in the building codes in your area, so you won't have to guess.

Speaking of building codes, be sure to check them before you decide on any construction method. The spring & cable thing does not meet the codes where I live, but your area may be different. If you're building a small mountain cabin then the codes will probably be a bit more relaxed than if you are building in a residential area. Still, what is your safety and the safety of your family really worth to you?

Best Regards
__________________
The early bird might get the worm, but it's the second mouse that gets the cheese!
Reply With Quote
  #6  
Old 03-26-2003, 06:17 AM
MikeS's Avatar
MikeS MikeS is offline
Registered User
 
Join Date: Feb 2003
Location: Grand Marais, MN
Posts: 318
MikeS is on a distinguished road
"You can see through bolt blow-outs on Handcrafted Log Homes all of the time.........pretty hard to drill a 10' long hole."

No, if you do it the right way, it's easy to do. Drill the holes after the rough scribe, and prior to the final scribe. We use a leveling tool to transfer the hole to the top of the log being drilled, and drill with a drill that has a bubble level. Hits the hole below all the time. No blow outs because we scribe after the hole is drilled. Rod can be installed after the assembly is completed.

There is no absolute one way to do things right. It's if you don't solve the short falls of a system that it is wrong. Do you use springs, Tim? Highly recommended, from my experience.
__________________
Mike Senty - Senty Handcrafted Log Homes - www.senty.com
Reply With Quote
  #7  
Old 03-26-2003, 03:20 PM
Rod Rod is offline
Registered User
 
Join Date: Mar 2003
Location: Edmonton, Alberta
Posts: 29
Rod is on a distinguished road
New member

Hi Everyone:
I'm new to this forum and must say that it is truly an invaluable source of information. I especially find this discussion of thru-bolts very interesting and have a quick, likely naive, question:

For full-scribe, handcrafted construction why are thru-bolts necessary, and where would they be located? I suspect that the answer to this is "beside door and window openings" but wouldn't the keyways and splines suffice for this?

Cheers,
Rod.
Reply With Quote
  #8  
Old 03-26-2003, 04:37 PM
Tim Bullock's Avatar
Tim Bullock Tim Bullock is offline
Postus Mostus
 
Join Date: Feb 2003
Posts: 1,232
Tim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud ofTim Bullock has much to be proud of
Mike, I do use the springs in the basement or crawlspace......Rod,
We use cables only when we have to conform to building codes....
I really dislike through bolts for the following reasons:
1. They are close to actual diameter of the hole and are prone to rust and condensation.
2. They are not nearly as strong as steel cable.
3. If the holes do not line up perfectly, this will affect the normal settling and could hang up the logs.

Mike is quite correct in that you can drill from log to log without the blowouts but can the total hole be plumb???

I have never liked the concept at all but the kit homes (log on log) had to do something to make their buildings stay together other than spikes...........Nuff said.
Reply With Quote
  #9  
Old 03-26-2003, 05:46 PM
MikeS's Avatar
MikeS MikeS is offline
Registered User
 
Join Date: Feb 2003
Location: Grand Marais, MN
Posts: 318
MikeS is on a distinguished road
Rod

I use through bolts plus springs because it improves the fit of the logs after settling. This is a long term benefit. In addition, since I also general contract, I have been aware of problems carpenters experience with overscribing techniques in log construction. I like overscribing, and use it. In the short term, through bolts allow adjustment, in order to plain out the top plates, so the roof is easy to frame and build. We'll use an impact wrench to drive the underscribed saddles tight, in preparation for the carpenters. This is not possible with cables or lag screws.

Some of Tim's comments about the problems of through bolts, like alignment, is an issue for one not experienced with their use. We have not found this to be a problem for us, and have used through bolts for 10 years or so. I'm not too concerned about the steel issue in logs, because we seal our logs such that the dew point is farther out in the laterals. We also do restoration, and steel is not the cause of rot in buildings we have worked on. We also encase our through bolts in plastic tubing, and use plated bolts. From my experience, the advantages far outweighs the disadvantages, if there are any disadvantages.

Location of through bolts is based on the builder experience and building methods. Near the corners of overscribed buildings is a minimum.

I would never build without some sort of fastener, especially for the top three courses minimum. We use so much insulation and packing, that our logs float during the assembly. The fasteners are essential to prepare the building for the carpenter, and plain it all out at the top plate and roof lines. Some sort of fastener is essential if you live in a high wind area, which is practically everywhere. What happens if a tornado goes over your log home?

There are many different ways to build. Each handcrafter, whether experienced or not, uses a list of components as part of their log work. Through bolts, cables, cutting methods, overscribing... all are components. The right combination gives good fitting log work, after drying and settling. There are several right combinations.

Look through my web site and read the "building methods" section, which goes over many of the handcrafted components used within the industry. It's a good summary for your education.

You won't be able to judge or choose a builder by whether or not they use through bolts, cables, pins, or any other fastener.
__________________
Mike Senty - Senty Handcrafted Log Homes - www.senty.com
Reply With Quote
  #10  
Old 03-26-2003, 07:03 PM
Dan Bodenstein's Avatar
Dan Bodenstein Dan Bodenstein is offline
Are we there yet?
 
Join Date: Feb 2003
Location: West Palm Beach, Florida
Posts: 144
Dan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud ofDan Bodenstein has much to be proud of
Lightbulb Knowledge is power, and I just blew a fuse.

No one mentioned Elmers Glue.

Well at least I can see that lag bolts and OlyLogs are not an option.

I am concerned with the "slice of cheese" effect, as Kyle mentioned. It seems to hold water. But I assume thickness of the logs would also be a factor.

It looks like springs and thru bolts are the way to go. I'd still like to hear some more opinions on this and would love some drawings. (Crayon drawing are ok)

Thanks to everyone who shared the knowledge.

I'm still a ways off from building log home #2 in North Carolina. So I am doing the homework!

Thanks!
Dan
Reply With Quote
  #11  
Old 03-27-2003, 09:45 AM
Rod Rod is offline
Registered User
 
Join Date: Mar 2003
Location: Edmonton, Alberta
Posts: 29
Rod is on a distinguished road
Tim, Mike: thanks for your informative and thought provoking replies.
Mike, I was surprised to hear that thru-bolts are used near the notches, as I had assumed that they are typically used for lateral support on log ends that are not notched. I'm assuming that this is to pre-compress the notches? I can understand how this would be beneficial to leveling the plate logs for framing.
You mentioned overscribing the laterals which brings to mind another question: during construction would you not end up with a significant gap between the header log and the log directly below at window and door openings? After settling, this gap would close, but how do you deal with it in the interim?

Cheers,
Rod.
Reply With Quote
  #12  
Old 03-29-2003, 03:56 AM
Kyle - Utah's Avatar
Kyle - Utah Kyle - Utah is offline
Registered User
 
Join Date: Mar 2003
Location: Utah (MCDBA, MCSE, MCSD, CCNP, CCIE, Electrical Engineering BS, Cultural Anthropology MA, Business Economics MA, Finance phD)
Posts: 139
Kyle - Utah is on a distinguished road
Well Put MikeS!
Reply With Quote
  #13  
Old 03-29-2003, 08:10 AM
BradBradstreet's Avatar
BradBradstreet BradBradstreet is offline
3rd Patron & "King Post"
 
Join Date: Feb 2003
Location: Maine, USA
Posts: 752
BradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud of
Send a message via AIM to BradBradstreet Send a message via Yahoo to BradBradstreet
Mike, we have discussed this a bit on the olde version of this forum. There is another alternative that seems to work in some situations. We used long, round, chinked dry logs (they go from corner to corner & are saddle notched).

With this approach we have 1" galvanized pipes that are cut to a length of 15" used a pins in the logs - every 18" or so. Each pipe section goes through a log and half way through the one underneath. The logs are spiked with a 12" spike at the corner notches - I think more for positioning.

As the log is being put in place a pad of insulation is put at the notch - log is lowered into the final position. Then the 2 corners are spiked. Then the 15" pipes are pounded through the log and half way through the one below. While the crew is doing this activity the crane goes back for the next log off the truck and gets it in place. With enough of a crew this can be a smooth operation with no pauses. One semi-truck load of logs gets placed and pinned each day. Truck arrives early in the morning and leaves empty at the end of the day.

In our case the log supplier had marked on the logs where to place a small plywood spacer (or two). As long as it is not too windy they stay in place. On day #2 we had to put a few back in place. On day #3 we could not move any of the spacers as the logs had settled down on the pipes. These spacers were to stop the settling. As the logs expand and contract that movement is taken up by the chinking since it is elastic. We have not seen any issues from our "owners' perspective".

Maybe Mike can provide insight into this approach from a builder's viewpoint.
Reply With Quote
  #14  
Old 03-29-2003, 05:18 PM
BradBradstreet's Avatar
BradBradstreet BradBradstreet is offline
3rd Patron & "King Post"
 
Join Date: Feb 2003
Location: Maine, USA
Posts: 752
BradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud ofBradBradstreet has much to be proud of
Send a message via AIM to BradBradstreet Send a message via Yahoo to BradBradstreet
Alan, that is one way of saying it. The log supplier told us up front the ridgepole would settle about a foot between the time the logs were erected and when the first door or window opening was cut. By then the expectation was that settling would be "done". Certainly the major settling.

Where we have a sheetrock wall on the first floor (bathroom) that joins into the exterior log wall. One can see where there is a gap between the top of a log and where the paint was put on the sheetrock. This shows about 1/4 to 3/8" of settling since the wall was painted (at the end of the building process).
Reply With Quote
  #15  
Old 03-29-2003, 09:15 PM
MikeS's Avatar
MikeS MikeS is offline
Registered User
 
Join Date: Feb 2003
Location: Grand Marais, MN
Posts: 318
MikeS is on a distinguished road
"would you not end up with a significant gap between the header log?"

Rod, you are right. This is one of the reasons we use through bolts, and torque the logs down strongly and compress the notches. The through bolts near the corners do the majority of the compression. With overscribing technique, the notches in fact are UNDERscribed. Laterals overscribed, notches underscribed, depends on what your basis of comparison is. This method does result in much tighter notches, after settling. However, it does create construction problems that have to be addressed, including the issue of a space at the window header log. Initially, tightening through bolts addresses this issue immediately after logs are set, plus it plains out the plate logs so the gables and roof go on to a flat plain. The ability to continue to tighten them keeps the top courses tight after settling and resists high wind uplift.

This is why techniques and components of differing log builders will be different. I would not use cables in conjunction with my fabrication techniques, undersribing for example. Bolts fit the bill much better.

20 years of experience is what this and all the other stuff we do is all about. It's the reason many customers hire log builders like me and Tim and other experienced log builders. (I had to include Tim in this, because he is buying me a beer soon, see "partay" thread.)

Brad; The logs in a chinked building are tied together structurally 1) at the corner notches, and 2) at the window/door splines. This is inadequate alone, consequently the addition of pipes and spikes. Your pipes and spikes, which are pounded in, not slipped in, are 1) reducing settling of the building and 2) stabilizing the log wall. To make this work, one needs to use very dry logs, build in a dry climate, use smaller diameter logs, and use synthetic chinking.

A scribe fit building does not need fasteners for structural reasons. The cope cut lateral will "grab" the log below in a way similar to tongue and groove boards. Fasteners are added for other reasons, such as above for one. Fasteners ARE required between the floor framing or foundation and the sill logs minimum. I would also suggest, minimum, the top 2 or 3 rows be fastened together, to resist wind uplift. High wind areas, more.
__________________
Mike Senty - Senty Handcrafted Log Homes - www.senty.com
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump




All times are GMT -5. The time now is 03:13 PM.


Powered by vBulletin® Version 3.6.8
Copyright ©2000 - 2010, Jelsoft Enterprises Ltd.